Construction demo greenhouse Syngenta: Tomato Vision Engineers      < Back

Location:
Maasland, The Netherlands

Cultivation:
Tomato

more information

Construction demo greenhouse Syngenta: Tomato Vision

In May 2020, the official opening of Syngenta's new R&D and marketing facility in Maasland took place. The realization of this demo greenhouse was established in a partnership between Syngenta and Arjan Bassie (Hortics BV).

Syngenta's wish was to realize a facility with multiple functions: testing and selecting new tomato varieties under different conditions, introducing new varieties and coming into contact with customers in order to be able to map market needs.

AAB was given the challenge to create a design where all these functions come together and to ensure a short but feasible construction period. Projectmanager Maik Rodenrijs: "The 14,000 m² greenhouse is divided into five cultivation sections with a foot height of 7 meters, in which various cultivation techniques are used. For example, 1/3rd of the greenhouse is lit and 2/3rd is unlit. "In addition to the cultivation departments, a completely new water space has been re-created, in which, among other things, the recipe silos and water storage silos have been set up. Given the limited work space and the desire to keep both the boiler and the CHP intact, the existing boiler house has been carefully dismantled and rebuilt from the existing foundation.

In addition to the cultivation departments, a demonstration and reception area (480 m²) has also been realized, which is open for visitors. From the first floor, visitors get a unique insight into the impressive breeding world of Syngenta. On the ground floor, the interior is equipped with a presentation room, meeting and office areas and the necessary hygienic facilities. These facilities force employees and visitors to adhere to strict protocols, which are critical to protect cultivation and research in the greenhouse departments. Facilities that contribute to this include changing rooms, sanitary blocks, access control, forced walking routes and hygiene locks in every walking route.

The very short construction period ran like a thread through the project. The construction of the steel structure did not start until week 34. However, planting had to be started no later than week 51, in order to be able to participate in the cycle of cultivation and the desired studies!
This remained in a construction period of only 17 weeks, in which all parties (greenhouse, screen, heating, water, electricity, groundworks, concrete and cultivation gutter supplier) had to realize their activities within the set of specifications and mutually coordinated. Despite the necessary challenges and sometimes a bit of luck, it is a great compliment to all parties involved that together we managed to realize Tomato Vision to the satisfaction of our joint client.

AAB provided project management, design and permits for this project.

Tomato Vision 4   Tomato Vision 16

Tomato Vision 7   Tomato Vision 26

Tomato Vision 21   Tomato Vision 17

Tomato Vision 19   Tomato Vision 19

Tomato Vision 25   Tomato Vision 30

Tomato Vision 36   Tomato Vision 38

Tomato Vision 53   Tomato Vision 40

Tomato Vision 41 Tomato Vision 54 Tomato Vision 56

If you close this message or continue to use this website, you are agreeing to the use of cookies on this website. Read more about cookies. Agree

Cookies

For our website we use cookies. A cookie is a simple small file that will be stored. The information which is stored in this cookie can be forwarded to our server in case of a next visit to our website. These cookies do not damage your computer and do not infringe on your privacy.
There are several different cookies. For the functional and technical cookies no authorization is needed. These are the cookies which are necessary to improve our website. For example data to log on or put products into a shopping basket (this is not applicable for this website). These functional and technical cookies are a necessity.

Also, there are analytical cookies, which we do use. We use those cookies with reference to the data collection via Google Analytics. With this, we get an insight in how our website has been used. With Google Analytics a processors agreement is applicable and we explicitly we did not authorize Google to use your data on behalf of others or Google itself. We deactivated the advertisement and remarketing options (these are necessary for, for example, AdWorks). Furthermore, we anonymize your IP address.

It is possible to deactivate or remove cookies. Information on this subject and the steps to be taken can be found through the website of Consumentenbond. https://www.consumentenbond.nl/internet-privacy/cookies-verwijderen